Roofers in South AustraliaSince November 2025, smaller jobs follow lighter rules.
In South Australia, domestic building work, repairs included, needs a building work contractor licence from Consumer and Business Services (CBS). Since 10 November 2025, jobs under $20,000 count as minor work, with no written contract or indemnity insurance required. Above that, you get a contract, a 5 per cent deposit cap and, for council-approved work, building indemnity insurance.
Under or over $20,000 in SA
| Under $20,000 (minor work) | $20,000 or more | |
|---|---|---|
| Licence | Still required, for the builder and any trades | Required |
| Written contract | Not legally required | Required, signed by both, with the Form 1 notice |
| Deposit | Be wary of paying a large one | No more than 5% |
| Building indemnity insurance | Not required | Required for council-approved work |
| Statutory warranties | Apply | Apply |
What changed on 10 November 2025?
The minor work threshold rose from $12,000 to $20,000, moving many roof repairs out of the formal contract rules. Statutory warranties still cover them, and court action for a breach must start within 5 years of completion.
Indemnity cover changed on the same day. It now covers defective work up to $250,000 where the builder dies, disappears or becomes insolvent.
CBS has detected forged certificates, so check yours at bii.sa.gov.au. Work can't start until you and the council have a copy. Don't pay extra or staged amounts in advance; they aren't covered.
What to look for on an SA roofer's licence
SA building licence numbers start with BLD. Each licence lists the work the holder can contract for, and some cap the contract value, so check the conditions cover roofing at your price.
Gutters and stormwater drains can be plumbing work, which must be done by a registered plumber working for a licensed business.
Search the CBS register (secure.cbs.sa.gov.au/OccLicPubReg/LicenceSearch.php) and ask for the licence card, which carries photo ID. See our licence check guide.
Contracts of $20,000 or more
The contract must be written, legible and signed by you both, include the builder's licence number, and come with Form 1. You can end it within 5 clear business days of signing by written notice, sent by certified mail or handed over in person. Beyond the deposit, the builder can only ask in writing for progress payments on finished work. On cost-plus contracts, their margin is capped at 15%.
Before you sign in South Australia
- BLD number checked on the CBS register, with conditions covering roofing
- Licence number on the quote and any contract
- No payments ahead of the work
- Ask your council whether the job needs development approval
Asbestos in SA homes
SafeWork SA says a home built or renovated before the mid-1980s is highly likely to contain asbestos, including in the roof and eaves. Home renovators don't legally need a licence to remove it, but SafeWork SA recommends a licensed removalist, and says friable asbestos should go to one. Never clean an asbestos cement roof with high-pressure water or by scrubbing. Waste can't go in bins or hard rubbish: double wrap it, label it and take it to a licensed disposal site.
Disputes with an SA roofer
CBS has an online building disputes advice form and offers conciliation, with compulsory conferences for serious matters. Court claims of $12,000 or less are minor claims in the Magistrates Court. Report a suspected unlicensed roofer to CBS on 131 882.
What Adelaide roofs deal with
Hail, mostly. The 22 January 1991 hailstorm brought stones up to 10 cm that damaged roof tiles across Adelaide. Since the 1970s Colorbond steel has dominated, replacing painted iron and cement or clay tiles. In designated bushfire-prone areas, Ministerial Building Standard MBS008 adds requirements.
A note on our SA sources
Several CBS and SA Government pages blocked our automated checks, so we read archived copies captured between late 2025 and September 2026. A 2025 amendment act adding licence offences had passed but not started when last captured. Confirm current rules with CBS before you sign.
What we'd do in SA
Under $20,000 the law asks for less paperwork, so we'd ask for it anyway: a written quote with the scope, the BLD number and a small deposit. Over $20,000, check the indemnity certificate yourself before handing over the 5%. Our guide to roofing quotes lists what a good quote includes.
Want a roofer to take a look?
Tell us the job and your postcode. We match it with a Find My Roofer certified roofer who specialises in that kind of work, and they call you to quote. Your number goes to them alone.
Cities in South Australia
Straight answers.
A roof restorer knocked on my door. What are my rights?
How long do I have to claim for faulty roof work?
Is plumbing work certified in SA?
Helpful next
Where this information comes from
- Legal Services Commission of South Australia (Law Handbook) Licensing of Builders (last revised 12 March 2026), 27 October 2026
- Consumer and Business Services (CBS), Government of South Australia Building licences - Frequently asked questions (PDF dated November 2025; read via Internet Archive copy captured 26 March 2026), 27 October 2026
- Legal Services Commission of South Australia (Law Handbook) Minor Domestic Building Work (last revised 11 November 2025), 27 October 2026
- SA.GOV.AU (Attorney-General's Department) Plumbing, gas fitting and electrical registration and contractors' licences (page updated 24 June 2024; read via Internet Archive copy captured 24 December 2025), 27 October 2026
- Consumer and Business Services (CBS), Government of South Australia Working as a plumber in SA - Information for interstate workers (read via Internet Archive copy captured 1 December 2025), 27 October 2026
- Consumer and Business Services (CBS), Government of South Australia Plumbers, Gas Fitters and Electricians Act 1995 - Licence categories: Plumbers (September 2025; read via Internet Archive copy captured 27 November 2025), 27 October 2026
- Consumer and Business Services (CBS), Government of South Australia Find a licence holder (read via Internet Archive copy captured 18 September 2026), 27 October 2026
- SA.GOV.AU (Attorney-General's Department) Building indemnity insurance (page updated 10 November 2025; read via Internet Archive copy captured 3 December 2025), 27 October 2026
- Legal Services Commission of South Australia (Law Handbook) Building Work Contracts, 27 October 2026
- Consumer and Business Services (CBS), Government of South Australia Building and renovating - tips to stay protected (read via Internet Archive copy captured 27 November 2025), 27 October 2026
- Consumer and Business Services (CBS), Government of South Australia South Australia's building and construction industry changes (read via Internet Archive copy captured 26 December 2025; live site blocked automated access), 27 October 2026
- Consumer and Business Services (CBS), Government of South Australia Action taken over unlicensed builder's advertising tactics (media release 17 December 2015; read via Internet Archive copy captured 3 April 2025), 27 October 2026
- SafeWork SA Deadly asbestos prompts warning for DIY home renovators (news, 25 April 2025; read via Internet Archive copy captured 25 November 2025), 27 October 2026
- Asbestos and Silica Safety and Eradication Agency (Australian Government) Householders and home renovators, 27 October 2026
- SA.GOV.AU (Attorney-General's Department) Disputes with a builder or tradesperson (page updated 1 August 2025; read via Internet Archive copy captured 21 November 2025), 27 October 2026
- Courts Administration Authority of South Australia Starting a civil case, 27 October 2026
- Legal Services Commission of South Australia (Law Handbook) Development Control (last revised 22 September 2026), 27 October 2026
- Australian Institute for Disaster Resilience (Knowledge Hub) South Australia, January 1991 (Adelaide hailstorm), 27 October 2026
- Wikipedia (climate tables cite Bureau of Meteorology) Adelaide, 27 October 2026
- SA Country Fire Service Planning and building, 27 October 2026
Every fact and rule on this page comes from the sources above, checked on the dates shown. How we write and check these pages.